Bored pier inspection in Catherine Field

Depth, diameter and cage, settled while the hole is still open.

  • After boring and cage placement, before concrete
  • About 1 hour on site
  • Report within 24 hours
Price your Catherine Field inspectionSend the address and where the build has got to.

Fully licensed & accredited

Stage1 of 7
When to bookAfter boring and cage placement, before concrete
Time on siteAbout 1 hour on site
Inspected againstAS 2870, AS 3600, the geotechnical report and the engineer's footing design

What is included in a Catherine Field bored piers inspection

  • Pier positions and spacing against the footing plan
  • Pier diameter checked at the top of each hole
  • Depth against the engineer's design and the soil report
  • Founding material at the base where visible
  • Reinforcement cage size, laps and starter bars
  • Cover to the cage and centralisers
  • Hole cleanliness, spoil and loose material
  • Standing water or seepage before the pour
  • Steel projection into the slab or beam
  • Termite and service penetrations near piers
  • Set-out against the site plan and boundaries
  • Records and photographs for the engineer where required
Why it matters here

Bored piers inspections on Catherine Field builds

Catherine Field still carries land that has never been built on, and where a footing has to reach past fill or find competent ground the engineer specifies piers. The depth of a bore is the entire point of the visit, and it stops being knowable the moment concrete goes in. The photographs below were taken in Leppington, Oran Park or Austral, between two and eight kilometres from Catherine Field, and each caption names its suburb. We would rather tell you that than let another job pass as a local one.

What we find at this stage in Catherine Field

  • Bore short of the depth the engineering requires
  • Cage off centre, so cover is uneven
  • Spoil or water left in the base
  • Cage lifted off the bottom
  • Reinforcement unsupported before the pour
An inspection summary, Austral, Catherine Field
An inspection summary, Austral
Sample findings

Sample defects found during our bored piers inspections in Catherine Field

Annotated findings from Bored piers inspections on Catherine Field builds. Client addresses withheld.

Grading is required, recorded at a fixing stage inspection in Austral
Grading required, Austral
Grading is required, recorded at a lock-up inspection in Austral
Grading recorded at lock-up, Austral
Bottom plate overhang of 25mm, recorded at a frame inspection in Leppington
Bottom plate overhanging the slab, Leppington
Bottom plate tie down at 600mm spacing, recorded at a frame inspection in Austral
Bottom plate tie down at 600mm spacing, Austral

The other stages of a Catherine Field build

  1. Slab pre-pour inspection in Catherine Field2Slab pre-pourThe day before the pour, steel and formwork complete
  2. Frame inspection in Catherine Field3FrameOnce frame and trusses are up and the roof is on, before lining
  3. Lock-up (pre-plaster) inspection in Catherine Field4Lock-up (pre-plaster)After roof, cladding and external doors, before plaster
  4. Fixing inspection in Catherine Field5FixingAfter mouldings, doors and joinery, before the painter
  5. Waterproofing inspection in Catherine Field6WaterproofingAfter the membrane is applied and before any tile is laid
  6. Pre-handover (PCI) inspection in Catherine Field7Pre-handover (PCI)Two to three weeks before your handover date

All construction stage inspections in Catherine Field →

Guides

Construction stage guides for Catherine Field

All guides →

Book a bored piers inspection in Catherine Field

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Bored piers inspections in Catherine Field: common questions

How much time does this take?

Under an hour on most lots, and longer where the pier count is high or the bores are spread over a sloping site.

And if a bore comes up short?

The measured depth is written next to the required depth. What happens next is for your builder and their engineer, and the report hands them the figure.

Do you sign off the footing?

No. We record against the engineering. Signing off is an engineer's function, and the report says where one is needed.

Does water at the base really matter?

Concrete placed into water is weakest exactly where the pier needs to be strongest. Recording it is what gets the bore pumped out first.

Is this common on Camden lots?

It follows the individual lot rather than the council. The soil report and the engineering decide whether piers are used at all.

What do you need from my side?

Your lot engineering, showing pier depths, diameters and positions.