An independent report on your Camden build, written the day we walk it.
One of our inspectors will call you back.
If it is urgent, email [email protected]
Fully licensed & accredited
NSW Fair Trading
Australian Society of Building Consultants
Strata Community Association
Building Dispute Practitioners Society
Seven checks through a Catherine Field build, hardware included.
Read more →
Both reports off one attendance, on largely recent housing.
Read more →
One element, taken on its own and measured against its requirement.
Read more →
Selling in Catherine Field? Know what a buyer's inspector will see before the campaign starts.










Six steps, enquiry to the call at the end.
Lot or street number, and how far the build has got. A fixed price comes back with travel in it.
Normally inside the week. On a stage visit the builder's program picks the date, not us.
A single message that an independent inspector is coming saves a locked gate and a wasted trip.
An hour at a pier check, two to three at a frame or handover, and longer wherever an upper level needs safe access.
Out inside twenty four hours, each item photographed, located and tied to the requirement it misses.
We ring and work through it, sorting the structural items from the presentation ones so you know where to stand firm.
Professional, thorough and objective inspection. The inspector took a careful and methodical approach and explained the observations clearly. We appreciate the professionalism shown throughout the process.
Philip was excellent inspector with the service and experience also with good recommendations.
We inspect every estate in Catherine Field 2557 and the surrounding suburbs of Leppington, Gledswood Hills, Oran Park, Barker, Gregory Hills and Denham Court. Our local inspectors are on site in Catherine Field most weeks, so travel never adds to the price.

A few cents of steel between a bolt and the timber.

A measured figure, not an impression.

Every truss, tied individually.
Building new in Catherine Field Two developments, and a suburb still mostly unbuilt.Read more →
Buying in Catherine Field Eleven sales in a quarter, and a median that moved 12 per cent.Read more →
Growth and development 2,609 residents, a cricket oval, and a theme park that used to be here.Read more →
Certifiers, council and disputes Camden Council, a principal certifier, and the route an argument takes.Read more →
The hardware in a tie down The cheapest parts of the house, doing a structural job.Read more →
When a defect list is all paint Twenty six records, one trade, and what that actually tells you.Read more →
The same builders, the same items Volume builders and trades work the whole corridor, so the same items come up.Read more →
Handover and the warranty clock Two periods, both starting the day the work is finished.Read more → Instant online pricing for Catherine Field, or contact the booking team.
It follows the house and the stage rather than the suburb. A single storey frame check is at the bottom of the range, a two storey handover at the top. Put the address into the form and a fixed figure comes back with travel included.
Normally inside the week. For any stage visit, call the moment the trade in question is finishing, because the window belongs to the builder's program and it is measured in days.
Inside twenty four hours, and usually the same evening after a stage visit, because a stage report loses its value the instant the following trade turns up.
The Google rating in the reviews section is real and you can read every review behind it on Google.
Hardware, more often than timber. The nearest frame records we hold are about missing washers, triple grips at a truss tie, bracket fixings and a bottom plate overhanging its slab by twenty five millimetres. Small parts, structural jobs.
Council deals with the planning approval. The build runs through a principal certifier who issues the construction certificate and the occupation certificate and does the mandatory critical stage inspections, all of which serves the certificate rather than your defect list.
Framing against AS 1684 and the engineering for your lot, masonry against AS 3700, wet areas against AS 3740, termite management against AS 3660, and the whole job against the National Construction Code, the ABCB Housing Provisions and the Guide to Standards and Tolerances 2017.
Under the Home Building Act 1989 it is six years on a major defect and two on anything else, running from the date the work was completed. The two year period is the one people lose, because it covers most of a handover list and expires quietly.
Our work is visual and confined to whatever can be reached without risk. We energise no circuit, pressurise no pipe, operate no appliance, dismantle nothing and certify no engineering.
Leppington, Gledswood Hills, Oran Park, Barker, Gregory Hills and Denham Court, plus Austral and the rest of the Camden and Macarthur area, at no travel charge.
It goes to your builder and we ring you to work through it. That call is where a long list becomes a short plan, because it tells you which three items are worth an argument.