Room by room, two to three weeks ahead of the day you sign.
A handover inspection is measured against your contract and selections, the Guide to Standards and Tolerances 2017, the National Construction Code and ABCB Housing Provisions, AS 3700 for masonry and AS 3740 for wet areas.
0 checkpoints across 0 areas on a standard Catherine Field pre-handover (PCI) inspection. We need the property accessible and, on a new build, the supervisor aware an independent inspector is attending. Whatever is blocked on the day is recorded as inaccessible, never as checked.
Photographed between three and eight kilometres from Catherine Field, on the same kind of build.










New Construction Stage Inspections Seven checks through a Catherine Field build, hardware included.
Defect Investigation Reports One element, taken on its own and measured against its requirement.
Pre-Purchase Building Inspections A visual inspection under AS 4349.1, on mixed stock.
Building and Pest Inspections Both reports off one attendance, on largely recent housing. Instant online pricing, or talk to the booking team on 1300 471 805.
Partly. It means the structural and envelope work was largely complete, which is the important half. It also means one trade was not finished, and that is worth listing room by room rather than as a single line.
Because that is what makes it get fixed. A line saying painting throughout produces one visit. Six located records produce six checks at the reinspection.
Two to three weeks ahead. Any later and the builder has no room to act, which turns your list into a settlement negotiation.