Lock-up inspection in Catherine Field

Roof on, brickwork up, services in, and the only clear view of the envelope.

  • After roof, cladding and external doors, before plaster
  • 1 to 2 hours on site
  • Report within 24 hours
Get a quoteLeave your details and an inspector will call.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage4 of 7
When to bookAfter roof, cladding and external doors, before plaster
Time on site1 to 2 hours on site
Inspected againstAS 3700 (masonry), AS 4773, AS 2047 (windows), NCC Part 3.5 roof and wall cladding, manufacturer flashing details

What is included in a Catherine Field lock-up (pre-plaster) inspection

  • Wall wrap and roof sarking coverage, laps and tears
  • Head, sill and jamb flashings to every window and door
  • Weep holes clear and correctly spaced
  • Articulation joints and cavity clearance
  • Mortar joints, brick ties and bed joint reinforcement
  • Lintels over openings and their bearing
  • Roof battens, tile or sheet fixing and ridge details
  • Valleys, penetrations and box gutter supports
  • Roof space insulation, sarking and services
  • Exhaust and rangehood ducting runs
  • External cladding fixing and clearance to ground
  • Garage, porch and alfresco set-downs
  • Site drainage and grading before landscaping
  • Debris and mortar droppings at the slab edge
Why it matters here

Lock-up (pre-plaster) inspections on Catherine Field builds

Lock-up is where the outside of the house gets its one unobstructed examination. The Austral lock-up records carry an expansion joint not continuous, excess mortar in the cavity and mortar work described as poor, render damaged, a flashing poorly installed, a parapet capping area not complete, downpipes on the first floor only, ceiling insulation not installed, a roof ventilator missing and an external door never hung. One record simply reads: rectifications required prior to plastering. We would rather tell you that than let another job pass as a local one.

What we find at this stage in Catherine Field

  • Expansion joints continuous through their full height
  • Mortar work, and mortar dropped in the cavity
  • Flashings and parapet capping installed properly
  • Downpipes present and connected on every level
  • Insulation, roof ventilation and external doors
Poor mortar workmanship, recorded at a lock-up inspection in Austral
Mortar work recorded as poor, Austral
Ceiling insulation not installed, recorded at a lock-up inspection in Austral
Ceiling insulation not installed, Austral
Rectifications required prior to plastering, recorded at a lock-up inspection in Austral
Rectifications required before plastering, Austral
Sample findings

Sample defects found during our lock-up (pre-plaster) inspections in Catherine Field

Annotated findings from Lock-up (pre-plaster) inspections.

Expansion joint not continuous, recorded at a lock-up inspection in Austral
Expansion joint not continuous, Austral
Excess mortar, recorded at a lock-up inspection in Austral
Excess mortar in the cavity, Austral
Roof area not complete, recorded at a lock-up inspection in Austral
Parapet capping area not complete, Austral
External door not installed, recorded at a lock-up inspection in Austral
External door not installed, Austral

The other stages of a Catherine Field build

  1. Bored piers inspection in Catherine Field1Bored piersAfter boring and cage placement, before concrete
  2. Slab pre-pour inspection in Catherine Field2Slab pre-pourThe day before the pour, steel and formwork complete
  3. Frame inspection in Catherine Field3FrameOnce frame and trusses are up and the roof is on, before lining
  4. Fixing inspection in Catherine Field5FixingAfter mouldings, doors and joinery, before the painter
  5. Waterproofing inspection in Catherine Field6WaterproofingAfter the membrane is applied and before any tile is laid
  6. Pre-handover (PCI) inspection in Catherine Field7Pre-handover (PCI)Two to three weeks before your handover date

All construction stage inspections in Catherine Field →

Guides

Construction stage guides for Catherine Field

All guides →

Book a lock-up (pre-plaster) inspection in Catherine Field

Instant online pricing for Catherine Field, or contact the booking team.

FAQ

Lock-up (pre-plaster) inspections in Catherine Field: common questions

Why must an expansion joint be continuous?

It is there so a masonry wall can move without cracking. Interrupt it and the wall is continuous through the interruption, so the movement finds a crack of its own choosing instead.

What does mortar in the cavity do?

It bridges the gap between the two brick skins. Water crossing the cavity then has a route to the inner leaf, rather than running down to a flashing and out through a weep hole.

Is a missing downpipe serious at this stage?

At lock-up it is an unfinished item, which is exactly why it is recorded then. Left to handover it becomes a roof discharging beside the footing every time it rains.

Why record insulation now?

Because ceiling insulation goes in before the plasterer and is very hard to verify afterwards without lifting batts in a finished roof space.

What is the duration of the visit?

Around two hours, with the report the same day, since the plasterer is usually only days off.

What if plastering has started?

Anything still open is assessed, and the parts already sealed up are noted as such.